Translink Platform
At a Glance
Share this:
Client
Translink
Location
- Northern Ireland
- , Northern Ireland
Services
- Installation
Products
- Re-Grip ULTRA GRP
Problem/Challenge
Due to chipping and deterioration, Translink had to repaint the white warning strips on the platform edges every 2 years. This caused considerable disruption and further incurred substantial costs.
Solution
After carrying out a cost comparison in relation to the use of GRP nosings as an alternative, Translink calculated that they would receive a pay back within 2 to 3 years.
Due to the non-corrosive properties of our GRP anti-slip nosings, Translink appointed Relinea as the chosen supplier of 15Km of warning strip GRP nosings in white.
The nosings were easily installed using suitable adhesive and hammer fixings which meant very little ground preparation was required.
Finally, Translink has found that the GRP nosing actually protects the platform edge from the corrosive action of frost and salt, and has moreover prevented further breakdown of the concrete at this point.