Search

Carrington Power Station

At a Glance

Sisk was the main contractor for this project. They appointed Relinea to supply a non-corrosive liner for a concrete plinth that would further act as a formwork whilst concrete was poured.
Share this:
Client
Sisk
Location
Services
Products

Problem/Challenge

The client required a non-corrosive and cost effective concrete plinth liner.

Solution

Relinea provided a non-corrosive solution for the client, that being a bespoke GRP moulded liner. The client found GRP to be a cost effective alternative to stainless steel, and furthermore easier to install due to its lightweight properties.

Scroll to Top