CERN – The European Organization for Nuclear Research based in Geneva in Switzerland is the largest particle physics laboratory in the world. Relinea won a tender to Design and Install a 660m2 GRP Support Frame and Grating and GRP Ladders in a new surface treatment building.
Relinea’s scope of works included the Design, Supply and Installation of a GRP Pultruded Frame Supporting GRP Heavy Duty Re-Grid Minimesh Grating that was required to product a false floor around free standing chemical baths in 5 no basins.
Read the full case study for more details.